terrace buildings completed
Today was finally completed the project Terrace be. A complete success in my opinion! Thanks again to man who has accomplished the goal line completely alone.
But the ex-client was able to become one or the other stone from the great pile back into the garden cart and play a little puzzle. We will see how the whole developed ...
Tuesday, May 27, 2008
Thursday, May 22, 2008
Are Genital Warts And Herpes Alike
terraces - Day 15
It is done - almost. The flooring from Kovalex WPC is in place . Our final conclusion can be seen well on the last photo of the current series of images: a floor board missing ...
... and is still bought later. We had not calculated with so much of the remaining length Unterkonstuktion since we have started from something other distances between the individual planks. Now the installation of a further sheet actually worth more.
today after work so we went to the home straight. The connector system of boards expect rapid progress lies.
With these mounting clips attached Unterkonstuktion and floating floor boards together. The somewhat strange pattern on the one plank in the background is the way, but dust from the intermediate storage in the garage.
No screw in the whole construction disabled - despite the artificial shape and the addition of 30% plastic - that something existing, natural stretch or shrinkage of the boards.
The plugging was really quite fast out of hand. However, it is helpful to work in pairs to carry out, as six compounds have more or less be knocked together at the same time. Since only two available hands like to a clip jumps to the other side out.
It is done - almost. The flooring from Kovalex WPC is in place . Our final conclusion can be seen well on the last photo of the current series of images: a floor board missing ...
... and is still bought later. We had not calculated with so much of the remaining length Unterkonstuktion since we have started from something other distances between the individual planks. Now the installation of a further sheet actually worth more.
today after work so we went to the home straight. The connector system of boards expect rapid progress lies.
With these mounting clips attached Unterkonstuktion and floating floor boards together. The somewhat strange pattern on the one plank in the background is the way, but dust from the intermediate storage in the garage.
No screw in the whole construction disabled - despite the artificial shape and the addition of 30% plastic - that something existing, natural stretch or shrinkage of the boards.
The plugging was really quite fast out of hand. However, it is helpful to work in pairs to carry out, as six compounds have more or less be knocked together at the same time. Since only two available hands like to a clip jumps to the other side out.
Wednesday, May 21, 2008
Diabetecs Marmalade Recipy
Tuesday, May 20, 2008
Spanish Quadriderm Cream
The stones because
This tractor-trailer load rubble has been ordered by us and a few neighbors in order to beautify our gardens and according to design trendsetter.
First, we want to fill the terrace two rocks with earth so that we can be there later on a sort of raised bed planting soil Ranker, as well as larger and smaller bushes. Similarly, there is a planned source stone.
On the other hand, much of the material in loose sequence is buried in our earth wall to make the large area a bit earthy.
This tractor-trailer load rubble has been ordered by us and a few neighbors in order to beautify our gardens and according to design trendsetter.
First, we want to fill the terrace two rocks with earth so that we can be there later on a sort of raised bed planting soil Ranker, as well as larger and smaller bushes. Similarly, there is a planned source stone.
On the other hand, much of the material in loose sequence is buried in our earth wall to make the large area a bit earthy.
Planning To Paint Hallway
Friday, May 9, 2008
Indegestion Vomitting
terraces - Day 10-12
In the last week now the fine work - cutting and popping - complete. Today, the whole was then shaken off and the first load of sand is swept. The South Terrace concrete pavement (Schaumburg tumbled rustic) is thus completed ! : O)
In retrospect, we have last year made a mistake, which we have now tasted long arms:
because we did not know at the time, where and how the terrace (s get there) later exactly (s), we have the soil on the complete Land and then moved to a Höhennieveau everything first sown. As a result, now that all excavated soil - at least about 13 cubic meters of earth - no dredging had to be transported from the site. This could have led to the turf surface including the highly affected. So
had to serve the wheelbarrow and brought us the aforementioned long arms. At least part of the garden, which was to be the terrace, in any case, you should have simply omit. Hindsight is ...
In the last week now the fine work - cutting and popping - complete. Today, the whole was then shaken off and the first load of sand is swept. The South Terrace concrete pavement (Schaumburg tumbled rustic) is thus completed ! : O)
In retrospect, we have last year made a mistake, which we have now tasted long arms:
because we did not know at the time, where and how the terrace (s get there) later exactly (s), we have the soil on the complete Land and then moved to a Höhennieveau everything first sown. As a result, now that all excavated soil - at least about 13 cubic meters of earth - no dredging had to be transported from the site. This could have led to the turf surface including the highly affected. So
had to serve the wheelbarrow and brought us the aforementioned long arms. At least part of the garden, which was to be the terrace, in any case, you should have simply omit. Hindsight is ...
Saturday, May 3, 2008
Mac Cosmetics Safe In Pregnancy
Friday, May 2, 2008
How To Color Hair Redviolet
Terraces - Terraces
This day has brought not only rain and hail, but also some sunshine in the afternoon. Thus, it was only lunchtime really going on in our garden. The small west terrace has mineral get through and was immediately compacted by hand tampers .
After the midday stone delivery, we have then also applied to the South Terrace and the hand yesterday aufgetregenen deducted split at the height (mineral, gravel and cobblestone final height is plus 1 cm). Then it went wrong with the laying of the first paving stones - until the evening lay so still have about half of the terrace surface area can.
morning it goes on and it must also be one or the other stone can be cut ...
This day has brought not only rain and hail, but also some sunshine in the afternoon. Thus, it was only lunchtime really going on in our garden. The small west terrace has mineral get through and was immediately compacted by hand tampers .
After the midday stone delivery, we have then also applied to the South Terrace and the hand yesterday aufgetregenen deducted split at the height (mineral, gravel and cobblestone final height is plus 1 cm). Then it went wrong with the laying of the first paving stones - until the evening lay so still have about half of the terrace surface area can.
morning it goes on and it must also be one or the other stone can be cut ...
Subscribe to:
Posts (Atom)